Schedule or defer §10.6.3 timeline windows (katrix-timeline) #95

Closed
opened 2026-08-13 21:36:20 +02:00 by thecrealm · 0 comments
Owner

Review finding: unroadmapped spec MUST — fell through the milestone cracks. D23 narrowed katrix-timeline to windows + diffs '(M3)'; M3 closed without a window criterion; M6 lists only thread timelines; the deferred table lists only the identity-server API. §10.6.3 MUSTs (Timeline handle with subscription-bounded residency, updates flow of snapshot+diff, ItemContent sealed hierarchy, stableId across echo/decryption, CR-16 timeline half) are unbuilt. Live evidence: samples/demo RoomTimeline.kt:49 hand-rolls 'the glue the §10.6.3 window module will subsume'; docs/benchmarks/2026-08-cold-start.md:82 defers an NFR-3 re-check to 'when windows land in M3'.

Roadmap decision needed (precedence rules 2/4): pull into M6 as a criterion, or add to the deferred table with a reconsider-when trigger.

Review finding: unroadmapped spec MUST — fell through the milestone cracks. D23 narrowed katrix-timeline to windows + diffs '(M3)'; M3 closed without a window criterion; M6 lists only thread timelines; the deferred table lists only the identity-server API. §10.6.3 MUSTs (Timeline handle with subscription-bounded residency, updates flow of snapshot+diff, ItemContent sealed hierarchy, stableId across echo/decryption, CR-16 timeline half) are unbuilt. Live evidence: samples/demo RoomTimeline.kt:49 hand-rolls 'the glue the §10.6.3 window module will subsume'; docs/benchmarks/2026-08-cold-start.md:82 defers an NFR-3 re-check to 'when windows land in M3'. Roadmap decision needed (precedence rules 2/4): pull into M6 as a criterion, or add to the deferred table with a reconsider-when trigger.
Sign in to join this conversation.
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference
thecrealm/katrix#95
No description provided.