OfflineClientEndToEndTest.run_two_paints_from_the_store_before_any_network flakes under phase-1 load (CI #420, 20 s timeout) #174

Closed
opened 2026-09-11 21:19:28 +02:00 by thecrealm · 0 comments
Owner

CI #420 (40c830f, phase 1 "Build and check"): :samples:offline-client:test failed — run_two_paints_from_the_store_before_any_network hit its 20 s withTimeout. The same test passed in #422 on the next commit; no code in its path changed between the two.

This is the D33 family (container/e2e suites starving behind build load in phase 1). Acceptance: either move :samples:offline-client:test into the phase-2 "quiet runner" step like the other container e2es (D33 addendum 2 precedent, #102), or give the paint-before-network wait a budget that survives phase-1 contention with the cause recorded; a re-run of #420's shape stays green.

CI #420 (40c830f, phase 1 "Build and check"): `:samples:offline-client:test` failed — `run_two_paints_from_the_store_before_any_network` hit its 20 s `withTimeout`. The same test passed in #422 on the next commit; no code in its path changed between the two. This is the D33 family (container/e2e suites starving behind build load in phase 1). Acceptance: either move `:samples:offline-client:test` into the phase-2 "quiet runner" step like the other container e2es (D33 addendum 2 precedent, #102), or give the paint-before-network wait a budget that survives phase-1 contention with the cause recorded; a re-run of #420's shape stays green.
thecrealm added
now
and removed
next
labels 2026-09-11 21:24:10 +02:00
thecrealm 2026-09-11 21:24:51 +02:00
  • closed this issue
  • removed the
    now
    label
Sign in to join this conversation.
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference
thecrealm/katrix#174
No description provided.